15,000 sf Article 28 compliant gut renovation of existing south clinical campus second floor space converted to 23 hour stay step-down recovery unit. The space included (14) total recovery beds including open bays and private rooms. In addition, a nurse call system update was included for 14 adjacent existing patient rooms, along with an overhaul of the facility medical gas master alarm system.
A TOP MEPĀ ENGINEERINGĀ FIRM