In-place, heavily phased full renovation within the operating main campus data center. All new carefully sequenced redundant UPS electrical distribution to support 425kW total data center load with new high-density rack architecture and overhead power busway distribution. In-row DX cooling units and hot aisle containment system provide effective and efficient high density cooling. A reconfigured 3M Sapphire clean agent fire suppression system is backed up by a new double interlock water-based fire protection system.
A TOP MEPĀ ENGINEERINGĀ FIRM