This three-phase main campus expansion included two new 1.5T GE Signa MRI machines, PET/CT and associated control and uptake spaces, and 10,000sf 14-bed radiology recovery suite in the A building basement.
Project included strategic coordination with active renovation designs on floors above to replace an existing air handling unit in place with a new larger knock-down (built in place) unit, all without disrupting HVAC to approximately 30,000sf of area served.
All new mechanical, electrical, plumbing, and med gas infrastructure was extended to this area of campus to support the new equipment and patient care in what was previously administrative space.